Design & Build for modification and additional facilities to existing (27) schools – Package two (8) nos.

The project involved designing, constructing, completing, and commissioning additional classroom building(s) while also ensuring compliance with fire and life safety codes. These modifications aimed to upgrade and enhance eight school buildings situated in Qatar. The primary goal was to expand the educational space within each school to accommodate the growing needs of the educational institution.
Scope of Works:

  • Al Wakra Girls Secondary (Pin 90041184)
  • Al Wakra Girls Primary (PIN 90041182)
  • Malek Bin Anis Model (PIN 32298039)
  • Khalifa Secondary Boys (PIN 34184001)
  • Umm Hakim Secondary Girls School (PIN 43150200)
  • Al Wajba Preparatory Girls School (PIN 312100340)
  • Hafsa Preparatory Girls School (PIN 40374004)
  • Rabaa Secondary Girls (PIN 46010524)

Client

Ashghal (Public Works Authority)

Consultant

Engineering Consultant Group (ECG) Qatar

Sector

Institutional

Completion

March 2021

Location

Al Wakra (2 nos.) and Doha (6 nos.)

Scope

Turnkey

Built-up Area

12,534 sqm.